2010 Custom Carolina Hull REDUCED SAVE 100'sKBoat ID: FastLink 167026
Photo 1
DescriptionA great opportunity to save time and money! Finish her as a convertible or express to your specs. Over $425,000 invested! EngineAccommodationsJuniper Framing: Bottom frames are 2x6 juniper tripled and engine room forward are tripled 2x10 floor frames. Side frames are 2x4 1/2" On The Bottom: 3/4" juniper strip planking 3 layers of 3/8' okoume with mat glass between each layer,one layer of 3408 and one layer of 1708 glass cloth Adtech Resin 861 865 Awlquick primer Lazerette Inside Bottom (for running gear support): Additional 2 layers of 3/4" okoume with mat glass between each layer Inside bottom is encapsulatedf in 3408 glass Adtech Resin 861 545 865 Awlquick primers top coated, fuel tanks are set Engine room and Lazerette inside sidewalls (for strength & cosmetic finish): an extra layer of 1/4" okoume Adtech Resin 861 545 865 Awlquick primer top coated, engines are set The engine room bottom is encapsulated in 3408 glass On the sides: 3/4" juniper strip planking on both sides 1/4" okoume there is one layer of 1708 Adtech Resin 861 865 545 Awlquick Bow: 1 layer of 1/2" okoume 2 layers of 1708, 1 layer of 3408 Adtech Resin 861 865 2 coats Bulkheades: Engine room, forward and aft are 2 layers of 3/4" okoume with mat glass between layers, both sides encapsulated with 3408 glass. Product information: Marine Okoume BS1088 Vector ply fiberglass mat (1.5oz.) 1708- Vector ply, high performance composite, non crimp fabric (cloth wt. 18oz.mat wt. 3/4oz.) 3408-Vector ply, high performance composite, non crimp fabric (cloth wt.34oz. mat wt.3/4oz.) 861-Adtech Ultra Fair 861 fairing compound (Resin & Hardener kit) 545-545 Epoxy Primer White Base 865- Adtech 865 Final Fair sprayable fairing compound AwlQuick primer- AwlQuick sanding surface Awl Top Coat 3 fuel tanks-2000 gallons- the forward tank is set in place. 1 water tank-300 gallons- set in place. Engine room is to primer stage,ready for top coat. Lazzertte is to primer stage,ready for top coat. Hull is faired to primer stage. Lower decks are in place,ready for interior layout to be decided. Salon deck beams are built. Plywood for salon & cockpit decks are pre-painted. Cabin carling are built. Rudder shelf is built. Boat is ready for engine choice. Contact Information
|
Photo 1